Where the Real Costs Hide — FarmPal

Wall materials are often the cheapest part. The big costs: foundation (concrete/drainage), roof (framing/metal), windows/doors, plumbing, electrical, and finish work. Budget 40% for everything above the walls, 20% for walls, 40% for systems and finishes. Salvage windows, doors, and fixtures to slash costs.

Wall materials are often the cheapest part. The big costs: foundation (concrete/drainage), roof (framing/metal), windows/doors, plumbing, electrical, and finish work. Budget 40% for everything above the walls, 20% for walls, 40% for systems and finishes. Salvage windows, doors, and fixtures to slash costs.